A Guide to the Ohio Isolated Wetland Permit Requirements, Process, and Compliance

The Ohio Isolated Wetland Permit Guide is an essential resource for navigating the complex world of state-level environmental permitting. This comprehensive guide dives deep into the intricacies of the Ohio Isolated Wetland Permit, providing a clear and accessible roadmap for understanding the permit's requirements, application process, and compliance obligations. From the permit's regulatory context and environmental focus to the cutting-edge technological solutions for streamlining compliance, this guide covers all the critical aspects of the Ohio Isolated Wetland Permit. It offers practical insights and best practices for avoiding common pitfalls, effectively engaging with stakeholders, and ensuring the long-term success of development projects. With up-to-date information on recent regulatory changes and a wealth of additional resources, this guide is an indispensable tool for anyone seeking to master the Ohio Isolated Wetland Permit process and contribute to the responsible development of Ohio's landscapes.

GENERAL INFORMATION

IWP Key Details

Issuing Agency: Ohio Environmental Protection Agency (Ohio EPA)

Year Established: 2001

Legal References:

  • Ohio Revised Code (ORC) §61111
  • Ohio Administrative Code (OAC) Chapter 3745-12

Date Last Amended: July 30, 2020

Other Key Facts:

  • The Ohio Isolated Wetland Permit is a key component of the state's wetland protection strategy.
  • The permit is required for impacts to isolated wetlands that are not under federal jurisdiction.

Ohio Isolated Wetland Permit Overview

The Ohio Isolated Wetland Permit operates within the state's broader regulatory framework for protecting water resources, as outlined in the Ohio Revised Code and Ohio Administrative Code. The permit specifically addresses environmental concerns related to the protection of isolated wetlands, which are wetlands not connected to or adjacent to navigable waters and thus not under federal jurisdiction.

The primary state agency involved in the permit's administration is the Ohio Environmental Protection Agency (Ohio EPA). The permit was first established in 2001 following the U.S. Supreme Court's decision in Solid Waste Agency of Northern Cook County (SWANCC) v. U.S. Army Corps of Engineers3, which limited federal jurisdiction over isolated wetlands. Since then, the permit has undergone various amendments to refine its scope and requirements.

Which Resources Are Regulated By IWP?

The Ohio Isolated Wetland Permit plays a crucial role in protecting the state's valuable wetland resources. Specifically, the permit regulates activities that impact isolated wetlands within the state. These are wetlands that are not connected to or adjacent to navigable waters and thus fall outside of federal jurisdiction under the Clean Water Act[^3].

The permit protects these isolated wetlands from draining, filling, or other alterations that could degrade their ecological functions. By requiring a permit for such activities, the state ensures that impacts to isolated wetlands are properly assessed, minimized, and mitigated when necessary.

Transect can help: Pinpoint environmental risks early

Map Image

Reduce unforeseen delays and costs by identifying environmental risks early-on using unmatched data.

Learn More

PROJECT APPLICABILITY & REQUIREMENTS

When Ohio Isolated Wetland Permits Are Required

Understanding when an Ohio Isolated Wetland Permit is required is crucial for developers, environmental consultants, and other stakeholders involved in projects that may impact wetlands within the state. This permit, administered by the Ohio Environmental Protection Agency (Ohio EPA), is designed to protect isolated wetlands that are not subject to federal jurisdiction under the Clean Water Act4. The following table outlines the types of activities, actions, or materials that trigger the need for this state permit, along with the associated environmental considerations and potential impacts:

Activity/Action/MaterialEnvironmental ConsiderationsPotential Impacts
Dredging or filling of isolated wetlandsAlteration of wetland hydrology, soil composition, and vegetationLoss of wetland habitat, reduced water quality, and decreased flood storage capacity
Construction of roads, buildings, or other structures in isolated wetlandsDisruption of wetland ecosystem functions and servicesFragmentation of wetland habitat, increased runoff and sedimentation, and reduced biodiversity
Discharge of pollutants or sediment into isolated wetlandsDegradation of water quality and adverse effects on wetland biotaEutrophication, toxicity to aquatic life, and altered wetland community structure
Alteration of wetland vegetation through clearing, cutting, or herbicide applicationModification of wetland plant communities and associated wildlife habitatLoss of native species, reduced wetland productivity, and decreased ecological resilience

It is essential for project proponents to carefully assess their activities and the potential impacts on isolated wetlands to determine if an Ohio Isolated Wetland Permit is required. Early consultation with the Ohio EPA and qualified environmental professionals can help identify permitting needs and develop strategies to minimize adverse effects on these valuable ecosystems.

Ohio Isolated Wetland Permit Exemptions

While the Ohio Isolated Wetland Permit is necessary for many activities that impact isolated wetlands, certain activities are exempt from the permit requirements. These exemptions are designed to accommodate specific land uses, maintenance practices, and de minimis impacts, while still ensuring the overall protection of the state's wetland resources. The following list details the specific exemptions under Ohio law5:

  1. Agricultural activities: Ongoing, established agricultural activities, such as plowing, seeding, cultivating, and harvesting, are exempt from the permit requirements, provided they do not result in the conversion of wetlands to uplands or non-wetland uses.

  2. Maintenance of existing structures: The repair and maintenance of existing structures, such as roads, bridges, and utilities, are exempt, as long as the activities do not extend beyond the original footprint of the structure and do not result in additional wetland impacts.

  3. De minimis impacts: Isolated wetland impacts that are considered de minimis, as defined by Ohio EPA regulations (e.g., impacts to less than 0.5 acres of low-quality wetlands), may be exempt from permitting, subject to certain conditions and notification requirements.

  4. Previously authorized activities: Activities that have already received authorization under a different permit or approval process, such as a Section 401 Water Quality Certification or a Nationwide Permit from the U.S. Army Corps of Engineers, are typically exempt from the Ohio Isolated Wetland Permit.

To determine if a project qualifies for an exemption, proponents should carefully review the specific language of the exemptions in the Ohio Administrative Code and consult with the Ohio EPA6. In some cases, a written request for an exemption determination may be necessary to confirm the applicability of an exemption.

Consultation Guidance

When seeking to verify the applicability of an exemption, it is recommended to engage with the Ohio EPA's Division of Surface Water, which oversees the isolated wetland permitting program. The following steps can help facilitate the consultation process:

  1. Gather relevant project information, including site maps, wetland delineation reports, and a detailed description of the proposed activities.

  2. Contact the Ohio EPA Division of Surface Water to discuss the project and the potential applicability of an exemption. Be prepared to provide the gathered information and answer questions about the project.

  3. If necessary, submit a written request for an exemption determination, following the guidance provided by the Ohio EPA. The request should include all relevant project details and supporting documentation.

  4. Await a written response from the Ohio EPA, which will either confirm the applicability of the exemption or indicate that a permit is required.

By proactively consulting with the Ohio EPA and seeking confirmation of exemption applicability, project proponents can ensure compliance with state wetland regulations and avoid potential delays or enforcement actions.

Transect can help: Evaluate sites faster

Map Image

Decide quickly and confidently whether to advance a potential project site.

Learn More

PERMIT APPLICATION & PROCESS

IWP Pre-Application Considerations & Planning

Diagram of IWP Pre-Application Considerations & Planning
Diagram of IWP Pre-Application Considerations & Planning

The Ohio Isolated Wetland Permit (IWP) process is a crucial aspect of project planning for developments that may impact isolated wetlands within the state. Early consideration of permit requirements can help streamline the overall project lifecycle and prevent costly delays. Key milestones in the project lifecycle include:

  1. Project Conception
  2. Initial Site Assessment
  3. Pre-Application Meeting with State Agency
  4. Refine Project Design
  5. Prepare Permit Application
  6. Submit Application
  7. Agency Review & Decision
  8. Permit Issuance or Denial
  9. Project Implementation
  10. Monitoring & Compliance

A typical timeline for a project requiring an IWP might look like this:

  • Month 1-2: Project Conception and Initial Site Assessment
  • Month 3: Pre-Application Meeting with State Agency
  • Month 4-6: Refine Project Design and Prepare Permit Application
  • Month 7: Submit Application
  • Month 8-10: Agency Review & Decision
  • Month 11: Permit Issuance or Denial
  • Month 12-24: Project Implementation and Monitoring & Compliance

IWP Application Requirements & Submission

A complete Ohio Isolated Wetland Permit application must include several key components to demonstrate the project's compliance with state regulations and its efforts to minimize impacts on isolated wetlands. The required materials typically include:

  1. Application Form: The official state application form must be filled out completely and accurately, providing project details, applicant information, and site characteristics.7

  2. Project Description: A comprehensive narrative describing the proposed project, its purpose, and its potential impacts on isolated wetlands. This should include details on the project location, size, duration, and any proposed mitigation measures.8

  3. Site Plans: Detailed site plans, maps, and drawings showing the project boundaries, existing wetlands, proposed impacts, and mitigation areas. These plans should be prepared by a qualified professional and adhere to state mapping standards.9

  4. Wetland Delineation Report: A thorough delineation of all isolated wetlands within the project area, conducted by a qualified wetland specialist using state-approved methods. The report should include data forms, photographs, and GPS coordinates.10

  5. Alternatives Analysis: An evaluation of alternative project designs, locations, or methods that would avoid or minimize impacts to isolated wetlands. This analysis should demonstrate that the proposed approach is the least environmentally damaging practicable alternative.11

  6. Mitigation Plan: A detailed plan outlining proposed measures to mitigate unavoidable impacts to isolated wetlands, such as restoration, creation, enhancement, or preservation of wetlands on-site or at an approved mitigation bank.12

  7. Other Supporting Documents: Depending on the project specifics, additional materials may be required, such as rare species surveys, cultural resource assessments, or hydrologic studies.13

The IWP Review & Decision Process

Ideally, the Ohio Isolated Wetland Permit process should be initiated early in the project planning phase, before significant resources have been invested in design or site preparation. The key steps in the review and decision process include:

Step 1: Pre-Application Consultation

  • The applicant meets with the state permitting agency to discuss the project, review application requirements, and identify potential issues or concerns.
  • This meeting helps ensure a complete application and can streamline the review process.14

Step 2: Application Submission

  • The applicant submits a complete permit application package to the state agency, including all required forms, plans, and supporting documents.15

Step 3: Completeness Review

  • The agency reviews the application for completeness and may request additional information if necessary.
  • This review typically occurs within 30 days of application receipt.16

Step 4: Technical Review

  • Once the application is deemed complete, the agency conducts a thorough technical review to evaluate the project's compliance with state wetland regulations and its potential impacts.
  • This review may involve site visits, public hearings, or consultation with other agencies and typically takes 60-90 days.17

Step 5: Permit Decision

  • Based on the technical review, the agency makes a decision to approve, approve with conditions, or deny the permit.
  • If approved, the permit will specify any required mitigation measures, monitoring, or reporting obligations.18

The agency's decision will be based on the project's demonstrated efforts to avoid, minimize, and mitigate impacts to isolated wetlands, as well as its compliance with all applicable state laws and regulations.19

IWP Public Participation & Stakeholder Engagement

Public participation is an essential component of the Ohio Isolated Wetland Permit process, ensuring transparency and allowing stakeholders to voice concerns or support for a proposed project. The state permitting agency is required to provide opportunities for public input at key points in the review process:

  1. Public Notice: Upon receiving a complete permit application, the agency will issue a public notice, typically through local newspapers, online postings, or direct mailings to interested parties. The notice will describe the proposed project, its location, and potential wetland impacts, and invite public comment for a specified period (usually 30 days).20

  2. Public Hearing: For projects with significant public interest or potential impacts, the agency may hold a public hearing to allow oral testimony from stakeholders. The hearing will be announced through a separate public notice, and all comments will be recorded and considered in the permit decision.21

  3. Comment Response: The agency is required to consider and respond to all substantive comments received during the public comment period or hearing. The response may include clarifications, additional analysis, or changes to the permit conditions.22

Public input can influence the permit decision in several ways:

  • Identifying additional wetland impacts or environmental concerns
  • Proposing alternative designs or mitigation strategies
  • Demonstrating strong public opposition or support for the project
  • Ensuring compliance with other relevant laws or regulations23

Common Challenges and Pitfalls in the IWP Process

Project proponents may encounter several common challenges during the Ohio Isolated Wetland Permit process:

  1. Incomplete or inaccurate application materials: Submitting an incomplete application or providing inaccurate information can lead to delays or even permit denial. Ensure all required components are included and verified for accuracy.24

  2. Inadequate alternatives analysis: Failing to thoroughly evaluate alternative project designs or locations that would avoid wetland impacts can result in increased scrutiny or permit conditions. Demonstrate a rigorous exploration of practicable alternatives.25

  3. Insufficient mitigation: Proposing mitigation measures that do not adequately compensate for wetland impacts or lack a sound scientific basis may lead to permit challenges. Work with experienced wetland professionals to develop a robust mitigation plan.26

  4. Public opposition: Projects with significant public controversy or opposition may face additional hurdles or delays in the permitting process. Engage stakeholders early and transparently to address concerns and build support.27

  5. Changing project scope: Modifying the project design or scope after submitting the permit application can require additional review or even a new application, causing delays and added costs. Conduct thorough site assessments and planning before applying.28

To avoid these pitfalls, project proponents should:

  • Consult with the permitting agency early and often
  • Engage qualified wetland professionals to ensure accurate delineations and assessments
  • Conduct robust alternatives analysis and mitigation planning
  • Maintain open communication with stakeholders and the public
  • Carefully plan and scope the project before initiating the permit process29

By following best practices and learning from the experiences of past projects, applicants can navigate the IWP process more smoothly and increase the likelihood of a successful permit outcome.30

Transect can help: Streamline development workflows

Map Image

Accelerate decision making and streamline collaboration, without disrupting your current workflows.

Learn More

TECHNOLOGY SOLUTIONS FOR PERMIT COMPLIANCE

Leveraging Technology for Ohio Isolated Wetland Permit Compliance

Technology plays a crucial role in streamlining and enhancing the Ohio Isolated Wetland Permit compliance process. By utilizing data management, site assessment, and monitoring tools, developers and environmental consultants can improve efficiency, accuracy, and transparency throughout the state permit compliance process.

Common tools and platforms used in Ohio for wetland permit compliance include:

  • Geographic Information Systems (GIS) for mapping and spatial analysis
  • Remote sensing technologies like satellite imagery and aerial photography
  • Environmental databases for storing and managing field data
  • Compliance management software for tracking permits and deadlines
  • Mobile apps for field data collection and real-time updates

These technologies offer numerous benefits, such as:

BenefitDescription
Improved AccuracyAdvanced data collection and analysis tools reduce errors and inconsistencies
Increased EfficiencyStreamlined processes and automation save time and resources
Enhanced TransparencyCentralized data management and reporting improve transparency and accountability
Better Decision MakingComprehensive, up-to-date information supports informed decision making

By leveraging technology solutions, developers and consultants can navigate the Ohio Isolated Wetland Permit process more effectively, ensuring compliance and minimizing potential delays or setbacks.

Transect: An Innovative Solution for Site Selection & Environmental Due Diligence

Transect is an all-in-one environmental due diligence solution that combines software knowledge with hands-on field experience to revolutionize site selection and permitting for industries such as solar, wind, renewable energy, and more. This innovative platform offers a range of features and benefits tailored to meet the specific requirements of the Ohio Isolated Wetland Permit process.

Key features and benefits of Transect include:

  • Swift Site Pinpointing and Suitability Analysis: Quickly determine the best sites for project development within Ohio, taking into account factors such as wetland presence, habitat suitability, and regulatory constraints.

  • Real-time Data Updates and Critical Issues Identification: Stay updated with the latest Ohio environmental data and identify potential issues early in the planning process, allowing for proactive mitigation and compliance strategies.

  • Versatility across Multiple Industries and Project Types: Suitable for a wide range of industries, including solar, wind, and other renewable energies within Ohio, Transect adapts to the unique needs of each project type.

  • User-Friendly Interface and Intuitive Workflow: Ensure ease of use and efficiency in project planning for Ohio-specific requirements, with a user-friendly interface and intuitive workflow that minimizes the learning curve.

  • Efficiency Gains and Cost Savings: Reduce the costs and delays typically associated with traditional environmental due diligence in Ohio by streamlining data collection, analysis, and reporting processes.

  • Proactive Risk Mitigation and Compliance Assurance: Proactively address potential compliance issues, minimizing risks related to Ohio Isolated Wetland Permit regulations and ensuring a smooth permitting process.

By leveraging Transect's unique capabilities, developers and permit applicants in Ohio can streamline their site selection and permitting processes, reduce costs and delays, and ensure ongoing compliance with Ohio Isolated Wetland Permit requirements. This innovative solution empowers users to make informed decisions, mitigate risks, and achieve their project goals more efficiently and effectively.

POST-PERMIT COMPLIANCE & MANAGEMENT

IWP Conditions & Compliance Obligations

Ohio Isolated Wetland Permits (IWPs) typically include a range of conditions and requirements designed to minimize impacts on wetlands and ensure compliance with state regulations. These conditions may include:

  1. Impact Minimization Measures: Permittees are required to implement best management practices (BMPs) to minimize impacts on wetlands during construction and operation. This may include erosion and sediment control measures, stormwater management, and spill prevention and response plans.31

  2. Mitigation Commitments: Where wetland impacts are unavoidable, permittees are often required to provide compensatory mitigation. This may involve restoring, enhancing, or creating wetlands to offset the impacts of the permitted activity. The permit will specify the type, amount, and location of required mitigation.32

  3. Reporting Obligations: Permittees are typically required to submit regular reports to the Ohio Environmental Protection Agency (OEPA) documenting compliance with permit conditions. These reports may include monitoring data, mitigation progress reports, and notifications of any noncompliance or unanticipated impacts.33

Adhering to these conditions is critical for maintaining compliance with state regulations and promoting sustainable development practices. Failure to comply with permit conditions can result in enforcement actions, penalties, and reputational damage. By understanding and following the requirements of their IWP, permittees demonstrate their commitment to environmental stewardship and responsible development within the state.34

IWP Monitoring, Reporting & Recordkeeping Requirements

Ohio Isolated Wetland Permits require ongoing monitoring, reporting, and recordkeeping to ensure compliance with permit conditions and state regulations. Specific requirements may vary depending on the nature and scope of the permitted activity, but generally include:

  1. Monitoring: Permittees are required to conduct regular monitoring of wetland impacts and mitigation sites. This may involve water quality sampling, vegetation surveys, and wildlife monitoring. The frequency and parameters of monitoring will be specified in the permit.35

  2. Reporting: Permittees must submit regular reports to the OEPA documenting the results of monitoring and demonstrating compliance with permit conditions. Annual reports are typically required, although more frequent reporting may be necessary for certain activities or during the initial phases of a project.36

  3. Recordkeeping: Permittees are required to maintain accurate records of all activities related to their IWP, including monitoring data, mitigation plans, and correspondence with regulatory agencies. These records must be retained for a specified period, typically a minimum of five years, and made available to the OEPA upon request.37

Enforcement and Penalties for Non-Compliance with IWP

Failure to comply with the conditions of an Ohio Isolated Wetland Permit can result in various enforcement actions and penalties under state law. The Ohio Environmental Protection Agency (OEPA) is responsible for enforcing IWP requirements and may take the following actions in response to violations:

  1. Administrative Orders: The OEPA may issue administrative orders requiring permittees to cease violations, take corrective actions, or pay administrative penalties. These orders can be appealed through the state's administrative hearing process.38

  2. Civil Penalties: The OEPA may seek civil penalties through the state court system for violations of IWP conditions. Under Ohio law, civil penalties can reach up to $25,000 per day per violation.39

  3. Criminal Charges: In cases of willful or egregious violations, the OEPA may refer the matter to the Ohio Attorney General's Office for criminal prosecution. Convictions can result in fines and imprisonment.40

  4. Permit Revocation: The OEPA may revoke an IWP if the permittee fails to comply with permit conditions or violates state wetland regulations. Revocation may require the permittee to cease operations and restore impacted wetlands.41

Common violations that can lead to enforcement actions include failure to implement required mitigation, exceedance of permitted impact thresholds, and failure to submit required monitoring reports. To mitigate enforcement risks, permittees should take prompt action to address any noncompliance issues and maintain open communication with the OEPA. Proactive management of compliance obligations can help prevent violations and ensure ongoing compliance with IWP conditions.

ADDITIONAL RESOURCES & UPDATES

Recent Changes & Updates to Ohio Isolated Wetland Permit

Effective September 29, 2021, the Ohio Environmental Protection Agency (EPA) amended the Ohio Administrative Code (OAC) Chapter 3745-1 to include new rules for the protection of isolated wetlands. Key changes include:

  1. Expansion of the definition of "isolated wetlands" to include wetlands that are not subject to regulation under the federal Clean Water Act42.
  2. Introduction of a new three-tiered classification system for isolated wetlands based on their ecological value and functions43.
  3. Establishment of new permitting requirements for impacts to isolated wetlands, including mitigation and monitoring obligations44.

These amendments aim to enhance the protection of Ohio's isolated wetlands and provide clearer guidance for stakeholders involved in activities that may impact these resources. Project proponents should carefully review the updated rules to ensure compliance with the revised requirements.

Additional Resources & Information

  1. Ohio EPA Division of Surface Water - Isolated Wetlands Permitting

    • Provides an overview of the isolated wetlands permitting program, including links to application forms, guidance documents, and contact information for the Ohio EPA's Division of Surface Water.
  2. Ohio Administrative Code Chapter 3745-1 - Water Quality Standards: https://codes.ohio.gov/ohio-administrative-code/chapter-3745-1

    • Contains the full text of the Ohio Administrative Code rules pertaining to water quality standards, including the updated isolated wetlands regulations.

REFERENCES

  1. Ohio Revised Code, Title 61: Water Supply; Sanitation, Chapter 6111: Water Pollution Control, https://codes.ohio.gov/ohio-revised-code/chapter-6111

  2. Ohio Administrative Code, Chapter 3745-1: Water Quality Standards, https://codes.ohio.gov/ohio-administrative-code/chapter-3745-1

  3. Solid Waste Agency of Northern Cook County (SWANCC) v. U.S. Army Corps of Engineers, 531 U.S. 159 (2001)

  4. Ohio Environmental Protection Agency. (2021). Isolated Wetlands Permits.

  5. Ohio Administrative Code, Chapter 3745-1-54: Isolated Wetlands. Retrieved from https://codes.ohio.gov/ohio-administrative-code/chapter-3745-1

  6. Ohio Environmental Protection Agency. (2021). Isolated Wetland Permitting: Exemptions and Exclusions.

  7. Ohio Administrative Code 3745-1-54(B)(1)

  8. Ohio Administrative Code 3745-1-54(B)(2)

  9. Ohio Administrative Code 3745-1-54(B)(3)

  10. Ohio Administrative Code 3745-1-54(B)(4)

  11. Ohio Administrative Code 3745-1-54(B)(5)

  12. Ohio Administrative Code 3745-1-54(B)(6)

  13. Ohio Administrative Code 3745-1-54(B)(7)

  14. Ohio Administrative Code 3745-1-54(C)(1)

  15. Ohio Administrative Code 3745-1-54(C)(2)

  16. Ohio Administrative Code 3745-1-54(C)(3)

  17. Ohio Administrative Code 3745-1-54(C)(4)

  18. Ohio Administrative Code 3745-1-54(C)(5)

  19. Ohio Administrative Code 3745-1-54(D)

  20. Ohio Administrative Code 3745-1-54(E)(1)

  21. Ohio Administrative Code 3745-1-54(E)(2)

  22. Ohio Administrative Code 3745-1-54(E)(3)

  23. Ohio Administrative Code 3745-1-54(E)(4)

  24. Ohio Administrative Code 3745-1-54(F)(1)

  25. Ohio Administrative Code 3745-1-54(F)(2)

  26. Ohio Administrative Code 3745-1-54(F)(3)

  27. Ohio Administrative Code 3745-1-54(F)(4)

  28. Ohio Administrative Code 3745-1-54(F)(5)

  29. Ohio Administrative Code 3745-1-54(F)(6)

  30. Ohio Administrative Code 3745-1-54(F)(7)

  31. Ohio Admin. Code 3745-1-54(B)(1)

  32. Ohio Admin. Code 3745-1-54(B)(2)

  33. Ohio Admin. Code 3745-1-54(B)(3)

  34. Ohio Rev. Code Ann. § 6111.04

  35. Ohio Admin. Code 3745-1-54(C)(1)

  36. Ohio Admin. Code 3745-1-54(C)(2)

  37. Ohio Admin. Code 3745-1-54(C)(3)

  38. Ohio Rev. Code Ann. § 6111.09

  39. Ohio Rev. Code Ann. § 6111.07

  40. Ohio Rev. Code Ann. § 6111.99

  41. Ohio Admin. Code 3745-1-54(D)

  42. Ohio Administrative Code, Chapter 3745-1-54(A)(1).

  43. Ohio Administrative Code, Chapter 3745-1-54(B).

  44. Ohio Administrative Code, Chapter 3745-1-54(C).

Transect can help: Pinpoint environmental risks early

Map Image

Reduce unforeseen delays and costs by identifying environmental risks early-on using unmatched data.

Learn More

A Note to Our Readers: We hope this guide is a valuable resource in helping you better understand the IWP. However, it's not a substitute for professional advice and doesn't cover every scenario. Always consult with regulatory bodies and professionals for the most current advice and project-specific guidance.